Design, Build, Finance and Maintain (DBFM)

Consistent project management with clear procedures, quality control and reporting at every stage, guarantee that our projects are delivered to the customer on time and within budget.

  • Timing
  • Budget
  • Reporting

During the Design phase of a pipeline project, our engineers are commissioned with the following tasks.

  • Basic engineering & feasibility (FEED)
  • Rough investment cost (+/- 15%)
  • Authority engineering (permits, MER & RUP if required)
  • Right of way (ROW)
  • Detailed engineering (technical specifications for pipes & equipment and for construction)
  • Procurement
  • Project financing

At the end of the Build phase, we execute the following steps:

  • Pre-commissioning
  • Cleaning
  • Drying

 

Pipelink is Asset Owner and Asset Integrity Management of High Pressure (underground) Pipelines in Europe

Our services are in general limited to the pipeline and valve stations (including the first onsite valve station) without upstream and downstream installations like pumping / compressor, metering and let-down stations.